Engineering, Procurement, Installation, and Commissioning of 2 x 15MVA Injection Substation (Civil and Electromechanical Works) Ilesa, Osun State (>$2million)
(Completed) 2012
British American Tobacco
Supply and Installation of a 4.6mw Diesel Generator (>$1.5million)
(Completed) 2014
BPS Limited
Power Audit and Load Studies of the Proposed 8.5MW Asaba Independent Power Plant (>$1million)
(Completed)
2016
Asaba Distribution Limited
Conceptual and Front-End Engineering Design of the 11kv 25km Underground Distribution Network (>$1million)
(Completed)
2016
BPS Limited
Promoters of the Development of the 8.5MW Asaba Independent Power Plant (>$9million)
(Completed) 2016
Asaba Distribution Limited
Promoters of the Development of the Asaba 11kv 25km Underground Distribution Network (>$3million)
(Completed) 2019
Ekiti IPP Limited
Power Audit and Load Studies of the Proposed 5MW Ekiti Independent Power Plant (<$200,000)
(Completed) 2021
Olokiti Power Distribution Limited
Conceptual and Front-End Engineering Design of the Olokiti 11kv 12km Underground Distribution Network (<$200,000)
(Completed) 2016
(WAEP) & NLNG
Supply, Installation and Commissioning of MV Packaged Substations (>$250,000)
(Completed) 2021
Tempo Paper Pulp & Packaging Limited
Developers of the 12MW Independent Power Plant (>$7million)
(Ongoing) 2022
Eko Electricity Distribution Company
Engineering, Procurement, Installation of 11kV overhead distribution network (Civil and Electromechanical Works) Badore, Ajah, Lagos State
(Ongoing) 2022
Olokiti Power Distribution Limited
Developers of the Olokiti 11kv 11km Underground Distribution Network (>$3million)
(Completed) 2023
Ekiti Ipp Limited
Developers of the 5MW Ekiti Independent Power Plant (>$6million)
(Completed) 2023
Ikeja Electric
Supply of 500kVA 11/.400kV transformers (< ₦150 million)